我們使用cookie來了解您如何使用我們的網站並改善您的體驗。 這包括個性化內容和廣告。 繼續使用我們的網站,即表示您接受我們對以下內容的使用: Cookies, Privacy Policy Term of use.
Video Player is loading.
Current Time 0:00
Duration 0:00
Loaded: 0%
Stream Type LIVE
Remaining Time 0:00
 
1x
111 觀看次數 • November 5, 2021

Remodeling the master bathroom : Oppussing av bad

Colorful Arts
Colorful Arts
So time for the master/upstairs bathroom. This was a big undertaking, it took a lot longer than I thought.. took about 3,5 months to complete, some of it due to waiting on the bathtub and some other stuff to arrive, but this was a lot of work. I think the end-result looks very nice, and It came out looking exactly as I designed it in sketchup. Credit: Stian Hammervold (Visit his YouTube channel for more videos: https://goo.gl/APZzev)
顯示全部
評論 0