Video Player is loading.
91
views •
November 5, 2021
Remodeling the master bathroom : Oppussing av bad

Colorful Arts
0 Followed
So time for the master/upstairs bathroom. This was a big undertaking, it took a lot longer than I thought.. took about 3,5 months to complete, some of it due to waiting on the bathtub and some other stuff to arrive, but this was a lot of work. I think the end-result looks very nice, and It came out looking exactly as I designed it in sketchup.
Credit: Stian Hammervold (Visit his YouTube channel for more videos: https://goo.gl/APZzev)
Show All 
Comment 0